Author of the publication

Exact resolution of the two-stage hybrid flow shop with dedicated machines.

, , and . Optim. Lett., 8 (8): 2329-2339 (2014)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

The two-stage hybrid flow shop problem with dedicated machines under release dates and delivery times., , and . Int. J. Adv. Oper. Manag., 7 (4): 300-316 (2015)Makespan Minimization for the Two-Stage Hybrid Flow Shop Problem with Dedicated Machines: A Comprehensive Study of Exact and Heuristic Approaches., , and . Comput., 11 (7): 137 (June 2023)A bicriteria flow-shop scheduling problem with two serial batching machines., , , and . Electron. Notes Discret. Math., (2010)An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs., , and . 4OR, 8 (1): 87-99 (2010)On the two-stage hybrid flow shop with dedicated machines., , and . RAIRO Oper. Res., 49 (4): 795-804 (2015)On the optimality conditions of the two-machine flow shop problem., , and . Eur. J. Oper. Res., 266 (2): 426-435 (2018)A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size., , , and . J. Sched., 17 (1): 17-29 (2014)Two Novel Mathematical Formulations for solving Two-Sided Assembly Line Balancing Problem., , and . ICCAD, page 1-6. IEEE, (2021)Multi-Manned Two-Sided Assembly Line Worker Assignment and Balancing Problem., , and . ICCAD, page 1-6. IEEE, (2022)A note on the two-stage hybrid flow shop problem with dedicated machines., , and . Optim. Lett., 6 (8): 1731-1736 (2012)