Author of the publication

A nested partitioning-based approach to integrate process planning and scheduling in flexible manufacturing environment.

, , , and . Int. J. Comput. Integr. Manuf., 28 (10): 1077-1091 (2015)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Coordinating collaborative assembly involving heterogeneous computer-aided design agents by an automated coordinator., , , and . Int. J. Computer Integrated Manufacturing, 24 (4): 365-374 (2011)Leak detection of pipeline: An integrated approach of rough set theory and artificial bee colony trained SVM., , and . Expert Syst. Appl., 39 (3): 3071-3080 (2012)Part-selection and machine-loading problems in a flexible manufacturing system environment: a heuristic approach based on reallocation paradigm., , and . Int. J. Comput. Appl. Technol., 32 (2): 142-157 (2008)An algorithm portfolio based solution methodology to solve a supply chain optimization problem., , , and . Expert Syst. Appl., 36 (4): 8407-8420 (2009)Optimization of the supply chain network: Simulation, Taguchi, and Psychoclonal algorithm embedded approach., , , and . Comput. Ind. Eng., 58 (1): 29-39 (2010)Traceability using RFID and its formulation for a kiwifruit supply chain., , , , , and . Comput. Ind. Eng., (2017)Rule based optimization for a bulk handling port operations., , , and . J. Intell. Manuf., 29 (2): 287-311 (2018)A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: A case study of highway construction project., , , and . Eng. Appl. Artif. Intell., 26 (8): 1953-1966 (2013)A data clustering algorithm for stratified data partitioning in artificial neural network., , and . Expert Syst. Appl., 39 (8): 7004-7014 (2012)Use of timed petri net and activity cycle diagram methodologies for modelling tandem AGVs in FMSs and their performance evaluation., , and . Int. J. Comput. Integr. Manuf., 14 (4): 399-408 (2001)