Author of the publication

Towards solving large-scale precedence constrained production scheduling problems in mining.

, , , and . GECCO, page 1137-1144. ACM, (2017)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Deterministic sampling in heterogeneous graph neural networks., , , and . Pattern Recognit. Lett., (August 2023)Multi-objective Beam-ACO for Maximising Reliability and Minimising Communication Overhead in the Component Deployment Problem., , and . Algorithms, 13 (10): 252 (2020)Tackling the maximum happy vertices problem in large networks., , and . 4OR, 18 (4): 507-527 (2020)Adaptive Population-based Simulated Annealing for Uncertain Resource Constrained Job Scheduling., , , , , and . CoRR, (2022)Authentic individual assessment for team-based software engineering projects., , , , and . ICSE (SEET), page 71-81. ACM, (2020)Minimising Cycle Time in Assembly Lines: A Novel Ant Colony Optimisation Approach., , , and . Australasian Conference on Artificial Intelligence, volume 12576 of Lecture Notes in Computer Science, page 125-137. Springer, (2020)Evolving Large Reusable Multi-pass Heuristics for Resource Constrained Job Scheduling., and . CEC, page 1-8. IEEE, (2020)Genetic programming approach to learning multi-pass heuristics for resource constrained job scheduling., , , and . GECCO, page 1167-1174. ACM, (2018)Large neighbourhood search based on mixed integer programming and ant colony optimisation for car sequencing., , , and . Int. J. Prod. Res., 58 (9): 2696-2711 (2020)A mixed integer linear programming model for reliability optimisation in the component deployment problem., , , and . J. Oper. Res. Soc., 67 (8): 1050-1060 (2016)