From post

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

Satisfiability tests and time‐bound adjustmentsfor cumulative scheduling problems., , и . Ann. Oper. Res., (1999)Constraint Propagation Techniques for Disjunctive Scheduling: The Preemptive Case., и . ECAI, стр. 619-623. John Wiley and Sons, Chichester, (1996)Constraint-Based Job Shop Scheduling with Ilog Scheduler., и . J. Heuristics, 3 (4): 271-286 (1998)Production scheduling with a piecewise-linear energy cost function., , , и . SSCI, стр. 1-8. IEEE, (2016)A Method for the Energy Optimization of a Multisource Elevator., , , и . ICINCO (Selected Papers), том 430 из Lecture Notes in Electrical Engineering, стр. 3-29. Springer, (2016)A combination of centralized and distributed methods for multi-agent planning and scheduling.. ICRA, стр. 488-493. IEEE, (1990)Integration of Rules and Optimization in Plant PowerOps., , , , , , , и . CPAIOR, том 3524 из Lecture Notes in Computer Science, стр. 1-15. Springer, (2005)Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems., и . Constraints An Int. J., 5 (1/2): 119-139 (2000)Multisource elevator energy optimization and control., , , и . ECC, стр. 2315-2320. IEEE, (2015)PMFP: The Use of Constraint-Based Programming for Predictive Personnel Management., , , и . ECAI, стр. 8-12. John Wiley and Sons, Chichester, (1994)