Two Drawn Drawing River for Treating Slope Field Soils
B. A.. International Journal of Trend in Scientific Research and Development, 5 (4):
1598-1600(June 2021)
Abstract
The paper presents devices and principle of operation of a two tier mouldboard ripper, as well as the results of research on justification of its design scheme and parameters. It is established that the most rational constructive scheme of the mouldboard two tier ripper with inclined legs is the plough scheme with the alternation of the working elements of the upper without the mouldboard and the lower tier with the mouldboard high quality ripping is provided at a longitudinal distance of 60 70 cm between the working elements. Buranova Sh. U. | Astanova M. M. | Khoshimov A. "Two-Drawn Drawing River for Treating Slope Field Soils" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-4 , June 2021, URL: https://www.ijtsrd.compapers/ijtsrd43617.pdf Paper URL: https://www.ijtsrd.comengineering/mechanical-engineering/43617/twodrawn-drawing-river-for-treating-slope-field-soils/buranova-sh-u
%0 Journal Article
%1 noauthororeditor
%A A., Buranova Sh. U. | Astanova M. M. | Khoshimov
%D 2021
%J International Journal of Trend in Scientific Research and Development
%K erosion moldboard ripper slope soil technology two-tier water
%N 4
%P 1598-1600
%T Two Drawn Drawing River for Treating Slope Field Soils
%U https://www.ijtsrd.comengineering/mechanical-engineering/43617/twodrawn-drawing-river-for-treating-slope-field-soils/buranova-sh-u
%V 5
%X The paper presents devices and principle of operation of a two tier mouldboard ripper, as well as the results of research on justification of its design scheme and parameters. It is established that the most rational constructive scheme of the mouldboard two tier ripper with inclined legs is the plough scheme with the alternation of the working elements of the upper without the mouldboard and the lower tier with the mouldboard high quality ripping is provided at a longitudinal distance of 60 70 cm between the working elements. Buranova Sh. U. | Astanova M. M. | Khoshimov A. "Two-Drawn Drawing River for Treating Slope Field Soils" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-4 , June 2021, URL: https://www.ijtsrd.compapers/ijtsrd43617.pdf Paper URL: https://www.ijtsrd.comengineering/mechanical-engineering/43617/twodrawn-drawing-river-for-treating-slope-field-soils/buranova-sh-u
@article{noauthororeditor,
abstract = {The paper presents devices and principle of operation of a two tier mouldboard ripper, as well as the results of research on justification of its design scheme and parameters. It is established that the most rational constructive scheme of the mouldboard two tier ripper with inclined legs is the plough scheme with the alternation of the working elements of the upper without the mouldboard and the lower tier with the mouldboard high quality ripping is provided at a longitudinal distance of 60 70 cm between the working elements. Buranova Sh. U. | Astanova M. M. | Khoshimov A. "Two-Drawn Drawing River for Treating Slope Field Soils" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-4 , June 2021, URL: https://www.ijtsrd.compapers/ijtsrd43617.pdf Paper URL: https://www.ijtsrd.comengineering/mechanical-engineering/43617/twodrawn-drawing-river-for-treating-slope-field-soils/buranova-sh-u
},
added-at = {2021-07-15T13:17:26.000+0200},
author = {A., Buranova Sh. U. | Astanova M. M. | Khoshimov},
biburl = {https://www.bibsonomy.org/bibtex/2403a787802c7c227fe7ae6626a450b1a/ijtsrd},
interhash = {d10fa6df3c1ef9e32a97acc9cd307575},
intrahash = {403a787802c7c227fe7ae6626a450b1a},
issn = {2456-6470},
journal = {International Journal of Trend in Scientific Research and Development},
keywords = {erosion moldboard ripper slope soil technology two-tier water},
language = {english},
month = jun,
number = 4,
pages = {1598-1600},
timestamp = {2021-07-15T13:17:26.000+0200},
title = {Two Drawn Drawing River for Treating Slope Field Soils
},
url = {https://www.ijtsrd.comengineering/mechanical-engineering/43617/twodrawn-drawing-river-for-treating-slope-field-soils/buranova-sh-u},
volume = 5,
year = 2021
}