Article,

Modeling, Simulation, control, and optimization of a geothermal power plant

.
Energy Conversion, IEEE Transactions on, 19 (1): 170 - 178 (March 2004)
DOI: 10.1109/TEC.2003.821823

Abstract

The main results of the simulation study of a double-flash geothermal plant, including a steam-CO<sub>2</sub> reboiler-based separation process, are presented. Dynamic models of two-phase, H<sub>2</sub>O-CO<sub>2</sub> components are derived, and their use for dynamic simulation and operating point optimization is discussed. Control system issues are then considered. On one hand, the simulator is used as an aid to design and test standard level and pressure control loops, whose actual performance would otherwise be difficult to predict due to the high degree of interconnection of the plant components. On the other hand, the control concept for the innovative part of the plant is discussed, recognizing that the control problem and the operating point optimization problems have to be tackled simultaneously. A simple, yet effective, solution for this problem is proposed.

Tags

Users

  • @thorade

Comments and Reviews