From post

Data-driven model predictive control for real-time planned lead time optimization in a reconfigurable flow line.

, , , и . Expert Syst. Appl., 238 (Part E): 122137 (марта 2024)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

A genetic algorithm for permutation flow shop scheduling under make to stock production system., , и . Comput. Ind. Eng., (2015)A real-time order acceptance and scheduling approach for permutation flow shop problems., , и . Eur. J. Oper. Res., 247 (2): 488-503 (2015)An event-based reactive scheduling approach for the Resource Constrained Project Scheduling Problem with unreliable resources., , , , и . Comput. Ind. Eng., (2021)Multi-operator immune genetic algorithm for project scheduling with discounted cash flows., , , и . Expert Syst. Appl., (2022)An Immune Genetic Algorithm for Resource Constrained Project Scheduling Problem with Discounted Cash Flows., , , и . IEEM, стр. 1179-1183. IEEE, (2020)Digital Twin-based Cyber Physical System for Sustainable Project Scheduling., , , и . IEEM, стр. 820-824. IEEE, (2019)Manufacturing project scheduling considering human factors to minimize total cost and carbon footprints., , , , и . Appl. Soft Comput., (2022)Real-Time Order Acceptance and Scheduling Problems in a Flow Shop Environment Using Hybrid GA-PSO Algorithm., , и . IEEE Access, (2019)Proactive in-house part-feeding for mixed-model assembly systems with dynamics., , , , , и . Comput. Ind. Eng., (2023)An Integrated Multi-project Scheduling, Materials Ordering and Suppliers Selection Problem., , , и . CENTERIS/ProjMAN/HCist, стр. 1609-1616. Elsevier, (2022)