Please log in to take part in the discussion (add own reviews or comments).
Cite this publication
More citation styles
- please select -
%0 Conference Paper
%1 conf/or/FeilP14
%A Feil, Matthias
%A Pöhle, Daniel
%B OR
%D 2014
%E Lübbecke, Marco E.
%E Koster, Arie
%E Letmathe, Peter
%E Madlener, Reinhard
%E Peis, Britta
%E Walther, Grit
%I Springer
%K dblp
%P 137-142
%T Why Does a Railway Infrastructure Company Need an Optimized Train Path Assignment for Industrialized Timetabling?
%U http://dblp.uni-trier.de/db/conf/or/or2014.html#FeilP14
%@ 978-3-319-28697-6
@inproceedings{conf/or/FeilP14,
added-at = {2016-04-20T00:00:00.000+0200},
author = {Feil, Matthias and Pöhle, Daniel},
biburl = {https://www.bibsonomy.org/bibtex/21549989922c64b20983ce7b57bacc7f4/dblp},
booktitle = {OR},
crossref = {conf/or/2014},
editor = {Lübbecke, Marco E. and Koster, Arie and Letmathe, Peter and Madlener, Reinhard and Peis, Britta and Walther, Grit},
ee = {http://dx.doi.org/10.1007/978-3-319-28697-6_20},
interhash = {4e193432c4247ac36c38767cf8d02b89},
intrahash = {1549989922c64b20983ce7b57bacc7f4},
isbn = {978-3-319-28697-6},
keywords = {dblp},
pages = {137-142},
publisher = {Springer},
timestamp = {2016-04-21T11:41:30.000+0200},
title = {Why Does a Railway Infrastructure Company Need an Optimized Train Path Assignment for Industrialized Timetabling?},
url = {http://dblp.uni-trier.de/db/conf/or/or2014.html#FeilP14},
year = 2014
}