We present a technique for team design based on cognitive work analysis (CWA). We first develop a rationale for this technique by discussing the limitations of conventional approaches for team design in light of the special characteristics of first-of-a-kind, complex systems. We then introduce the CWA-based technique for team design and provide a case study of how we used this technique to design a team for a first-of-a-kind, complex military system during the early stages of its development. In addition to illustrating the CWA-based technique by example, the case study allows us to evaluate the technique. This case study demonstrates that the CWA-based technique for team design is both feasible and useful, although empirical validation of the technique is still necessary. Applications of this work include the design of teams for first-of-a-kind, complex systems in military, medical, and industrial domains.
- difference between work problems and work demands? tasks and demands?
- fig 2 interesting division of work into situations (modes?), problems, and phases
- posits 'problems' as higher-level agglomeration of 'tasks' - tricky wording
- once you have the problems (mapped from demands) and situations, can examine what teams might best be able to handle that - in a formative way. That is, not *overly* prejudiced about what system will look like (other than physical limits like # of passengers a plane can hold etc.)
%0 Journal Article
%1 naikar03
%A Sanderson, Penelope M.
%A Drumm, Dominic
%A Pearce, Brett
%A Naikar, Neelam
%D 2003
%I Extenza
%J Human Factors
%K work study team analysis cognition 1406
%N 2
%P 202--217
%T Designing Teams for First-of-a-Kind, Complex Systems Using the Initial Phases of Cognitive Work Analysis: Case Study
%U http://www.extenza-eps.com/extenza/loadHTML?objectIDValue=27236&type=abstract
%V 45
%X We present a technique for team design based on cognitive work analysis (CWA). We first develop a rationale for this technique by discussing the limitations of conventional approaches for team design in light of the special characteristics of first-of-a-kind, complex systems. We then introduce the CWA-based technique for team design and provide a case study of how we used this technique to design a team for a first-of-a-kind, complex military system during the early stages of its development. In addition to illustrating the CWA-based technique by example, the case study allows us to evaluate the technique. This case study demonstrates that the CWA-based technique for team design is both feasible and useful, although empirical validation of the technique is still necessary. Applications of this work include the design of teams for first-of-a-kind, complex systems in military, medical, and industrial domains.
@article{naikar03,
abstract = {We present a technique for team design based on cognitive work analysis (CWA). We first develop a rationale for this technique by discussing the limitations of conventional approaches for team design in light of the special characteristics of first-of-a-kind, complex systems. We then introduce the CWA-based technique for team design and provide a case study of how we used this technique to design a team for a first-of-a-kind, complex military system during the early stages of its development. In addition to illustrating the CWA-based technique by example, the case study allows us to evaluate the technique. This case study demonstrates that the CWA-based technique for team design is both feasible and useful, although empirical validation of the technique is still necessary. Applications of this work include the design of teams for first-of-a-kind, complex systems in military, medical, and industrial domains.},
added-at = {2006-03-24T16:34:33.000+0100},
author = {Sanderson, Penelope M. and Drumm, Dominic and Pearce, Brett and Naikar, Neelam},
biburl = {https://www.bibsonomy.org/bibtex/2883aedd3a4238ebb0599ceab2d506bff/neilernst},
citeulike-article-id = {142723},
comment = {- difference between work problems and work demands? tasks and demands?
- fig 2 interesting division of work into situations (modes?), problems, and phases
- posits 'problems' as higher-level agglomeration of 'tasks' - tricky wording
- once you have the problems (mapped from demands) and situations, can examine what teams might best be able to handle that - in a formative way. That is, not *overly* prejudiced about what system will look like (other than physical limits like # of passengers a plane can hold etc.)},
description = {sdasda},
interhash = {14bd22b5290535488c952f1192f3a7f2},
intrahash = {883aedd3a4238ebb0599ceab2d506bff},
journal = {Human Factors},
keywords = {work study team analysis cognition 1406},
number = 2,
pages = {202--217},
priority = {0},
publisher = {Extenza},
timestamp = {2006-03-24T16:34:33.000+0100},
title = {Designing Teams for First-of-a-Kind, Complex Systems Using the Initial Phases of Cognitive Work Analysis: Case Study},
url = {http://www.extenza-eps.com/extenza/loadHTML?objectIDValue=27236\&type=abstract},
volume = 45,
year = 2003
}