Author of the publication

An effective metaheuristic with a differential flight strategy for the distributed permutation flowshop scheduling problem with sequence-dependent setup times.

, , , , and . Knowl. Based Syst., (2022)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

An improved general variable neighborhood search for a static bike-sharing rebalancing problem considering the depot inventory., , , , , , , and . Expert Syst. Appl., (2020)An effective population-based iterated greedy algorithm for solving the multi-AGV scheduling problem with unloading safety detection., , , , and . Inf. Sci., (February 2024)An improved iterated greedy algorithm for the energy-efficient blocking hybrid flow shop scheduling problem., , , , , , and . Swarm Evol. Comput., (2022)An effective discrete invasive weed optimization algorithm for multi-AGVs dispatching problem with specific cases in matrix manufacturing workshop., , , , , and . Comput. Ind. Eng., (2022)An effective metaheuristic with a differential flight strategy for the distributed permutation flowshop scheduling problem with sequence-dependent setup times., , , , and . Knowl. Based Syst., (2022)A dual population collaborative genetic algorithm for solving flexible job shop scheduling problem with AGV., , , , , , and . Swarm Evol. Comput., (2024)An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem., , , , , and . Int. J. Prod. Res., 55 (24): 7302-7316 (2017)A Self-Adaptive Learning Approach for Uncertain Disassembly Planning Based on Extended Petri Net., , , , and . IEEE Trans. Ind. Informatics, 19 (12): 11889-11897 (December 2023)An MCDM-Based Multiobjective General Variable Neighborhood Search Approach for Disassembly Line Balancing Problem., , , , and . IEEE Trans. Syst. Man Cybern. Syst., 50 (10): 3770-3783 (2020)A Three-Stage Multiobjective Approach Based on Decomposition for an Energy-Efficient Hybrid Flow Shop Scheduling Problem., , , , , and . IEEE Trans. Syst. Man Cybern. Syst., 50 (12): 4984-4999 (2020)