Author of the publication

Determining the Value of Sequential and Concurrent NPD Processes.

, , and . Concurrent Engineering: R&A, 16 (3): 201-211 (2008)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Optimal utilisation level for lean product development in a multitasking context., , , and . Int. J. Prod. Res., 55 (3): 795-818 (2017)Change prediction using interface data., , , , , and . Concurr. Eng. Res. Appl., 21 (2): 141-154 (2013)Determining the Value of Sequential and Concurrent NPD Processes., , and . Concurrent Engineering: R&A, 16 (3): 201-211 (2008)Agent-based control of manufacturing processes., , , , , and . IJMR, 1 (4): 466-481 (2006)Energy Model based Control for Forming Processes., and . ICINCO-ICSO, page 51-59. INSTICC Press, (2008)A ladle heat loss model for daily production., and . IJMR, 12 (3): 351-363 (2017)A Quantitative Evaluation of Concurrent Product Development Effectiveness Theories., , and . IEEE Trans. Engineering Management, 59 (3): 415-427 (2012)Ontology based interface design and control methodology for collaborative product development., and . Comput. Aided Des., 44 (5): 432-444 (2012)Design Parameter Estimation using a Modified QFD Method to Improve Customer Perception., , and . Concurrent Engineering: R&A, 13 (1): 57-67 (2005)Entropy as a measure of operational flexibility., , and . Eur. J. Oper. Res., 165 (3): 696-707 (2005)