Author of the publication

To shrink or not to shrink: Hotelling's T2 chart based on shrunken covariance estimates.

, , , and . Quality and Reliability Eng. Int., 34 (6): 1211-1227 (2018)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

To shrink or not to shrink: Hotelling's T2 chart based on shrunken covariance estimates., , , and . Quality and Reliability Eng. Int., 34 (6): 1211-1227 (2018)Properties of the Markov-Dependent Attribute Control Chart with Estimated Parameters., , and . Quality and Reliability Eng. Int., 32 (2): 485-498 (2016)Properties of the T2 Control Chart When Parameters Are Estimated., , and . Technometrics, 47 (4): 437-445 (2005)Predicting lifetime by degradation tests: A case study of ISO 10995., , and . Qual. Reliab. Eng. Int., 34 (6): 1228-1237 (2018)A double-integral equation for the average run length of a multivariate exponentially weighted moving average control chart. Statistics & Probability Letters, 24 (4): 365--373 (September 1995)Attribute Charts for Monitoring a Dependent Process., , , and . Quality and Reliability Eng. Int., 23 (3): 341-365 (2007)Using the predictive distribution to determine control limits for the Bayesian MEWMA chart., and . Communications in Statistics - Simulation and Computation, 46 (10): 7818-7826 (2017)The Efficiency of a Wavelet Transformation Approach to Prospective Monitoring., and . Quality and Reliability Eng. Int., 31 (3): 489-500 (2015)The Performance of Exponentially Weighted Moving Average Charts With Estimated Parameters., , and . Technometrics, 43 (2): 156-167 (2001)Are principal components with estimated parameters feasible in multivariate process control?, and . Qual. Reliab. Eng. Int., 38 (8): 4141-4156 (2022)