Author of the publication

Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled.

, , , and . Discret. Appl. Math., 156 (3): 352-367 (2008)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A hybrid approach based on genetic algorithms to solve the problem of cutting structural beams in a metalwork company., , and . J. Heuristics, 19 (2): 253-273 (2013)Scheduling in Hybrid Flowshops with Sequence Dependent Setup Times. A MILP Model and a Simulated Annealing Based Approach.. IC-AI, page 245-249. CSREA Press, (2002)An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan., , and . Expert Syst. Appl., 39 (9): 8095-8107 (2012)Optimization of empty container movements using street-turn: Application to Valencia hinterland., , , and . Comput. Ind. Eng., 66 (4): 909-917 (2013)Comparing dispatching rules in dynamic hybrid flow shops., , and . ETFA, page 233-239. IEEE, (2006)Group technology in a hybrid flowshop environment: A case study., , , , and . Eur. J. Oper. Res., 167 (1): 272-281 (2005)Balancing and scheduling tasks in assembly lines with sequence-dependent setup times., , and . Eur. J. Oper. Res., 187 (3): 1212-1223 (2008)Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion., , , and . J. Oper. Res. Soc., 53 (12): 1317-1323 (2002)Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled., , , and . Discret. Appl. Math., 156 (3): 352-367 (2008)Corrigendum to "Balancing and scheduling tasks in assembly lines with sequence-dependent setup" European Journal of Operational Research 187 (2008) 1212-1223., , and . Eur. J. Oper. Res., 201 (1): 336 (2010)