Author of the publication

A new enhanced support vector model based on general variable neighborhood search algorithm for supplier performance evaluation: A case study.

, , , and . Int. J. Comput. Intell. Syst., 10 (1): 293-311 (2017)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A new interval-valued hesitant fuzzy pairwise comparison-compromise solution methodology: an application to cross-docking location planning.. Neural Comput. Appl., 31 (9): 5159-5173 (2019)An integrated weighting and ranking model based on entropy, DEA and PCA considering two aggregation approaches for resilient supplier selection problem., , and . J. Comput. Sci., (2020)An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms., , , , and . Eng. Appl. Artif. Intell., (2015)A new weighted distance-based approximation methodology for flow shop scheduling group decisions under the interval-valued fuzzy processing time., , , and . Appl. Soft Comput., (2020)A soft computing approach based on critical chain for project planning and control in real-world applications with interval data., , , , and . Appl. Soft Comput., (2021)A new hesitant fuzzy analytical hierarchy process method for decision-making problems under uncertainty., , and . IEEM, page 622-626. IEEE, (2014)Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods., , , and . Comput. Ind. Eng., (2018)Soft computing-based preference selection index method for human resource management., , and . J. Intell. Fuzzy Syst., 26 (1): 393-403 (2014)Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis., , , and . J. Intell. Fuzzy Syst., 26 (2): 949-959 (2014)An earned value model with risk analysis for project management under uncertain conditions., , and . J. Intell. Fuzzy Syst., 32 (1): 97-113 (2017)