Author of the publication

Finding an optimal Nash equilibrium to the multi-agent project scheduling problem.

, , and . J. Sched., 20 (5): 475-491 (2017)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A Cooperative Approach for Job Shop Scheduling under Uncertainties., , and . CDM, volume 176 of Frontiers in Artificial Intelligence and Applications, page 5-15. IOS Press, (2008)Mean Response-Time Minimization of a Soft-Cascade Detector., , , and . ICORES, page 252-260. SciTePress, (2016)A mass-flow MILP formulation for energy-efficient supplying in assembly lines., , , , , and . CoRR, (2015)The resource-constrained activity insertion problem with minimum and maximum time lags., and . J. Sched., 12 (5): 447-460 (2009)Soft-Cascade Learning with Explicit Computation Time Considerations., , , and . WACV, page 1234-1243. IEEE Computer Society, (2018)A decision support framework for cooperation in make-to-order production., , and . COOP, page 69-82. IOS, (2004)Une aide à la coopération interentreprises pour la production à la commande., , and . Document Numérique, 8 (1): 23-36 (2004)Finding an optimal Nash equilibrium to the multi-agent project scheduling problem., , and . J. Sched., 20 (5): 475-491 (2017)Nash equilibrium solutions in multi-agent project scheduling with milestones., , , and . Eur. J. Oper. Res., 294 (1): 29-41 (2021)Nash equilibria for the multi-agent project scheduling problem with controllable processing times., , , and . J. Sched., 18 (1): 15-27 (2015)