Author of the publication

New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms.

, and . Comput. Oper. Res., (May 2023)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints., , and . Manag. Sci., 47 (8): 1113-1121 (2001)Discrete time/cost trade-offs in project scheduling with time-switch constraints., , and . J. Oper. Res. Soc., 53 (7): 741-751 (2002)Comparison and hybridization of crossover operators for the nurse scheduling problem., and . Ann. Oper. Res., 159 (1): 333-353 (2008)A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups., and . Comput. Oper. Res., 39 (10): 2346-2358 (2012)Computing project makespan distributions: Markovian PERT networks revisited., and . Comput. Oper. Res., (2019)Influence of learning in resource-constrained project scheduling., and . Comput. Ind. Eng., (2015)Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber., , and . Comput. Ind. Eng., 61 (3): 697-708 (2011)On the resource renting problem with overtime., , and . Comput. Ind. Eng., (2017)A hybrid scatter search heuristic for personalized crew rostering in the airline industry., and . Eur. J. Oper. Res., 206 (1): 155-167 (2010)Maximising the weighted number of activity execution modes in project planning., and . Eur. J. Oper. Res., 270 (3): 999-1013 (2018)