Author of the publication

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

The Asymptotic Optimality of the SPT Rule for the Flow Shop Mean Completion Time Problem., and . Oper. Res., 49 (2): 293-304 (2001)Effective Heuristics for Capacitated Production Planning with Multiperiod Production and Demand with Forecast Band Refinement., and . Manuf. Serv. Oper. Manag., 6 (2): 184-194 (2004)Utilizing Forecast Band Refinement for Capacitated Production Planning., and . Manuf. Serv. Oper. Manag., 3 (1): 68-81 (2001)A two-step gradient estimation approach for setting supply chain operating parameters., and . Comput. Oper. Res., (2018)Online scheduling to minimize total weighted (modified) earliness and tardiness cost., and . J. Sched., 24 (4): 431-446 (2021)Asymptotic analysis of an on-line algorithm for the single machine completion time problem with release dates., and . Oper. Res. Lett., 29 (3): 141-148 (2001)A Framework for the Analysis of Metaheuristics for the Travelling Salesman Problem with Drone with Interceptions., , , and . ICCSA (2), volume 13957 of Lecture Notes in Computer Science, page 351-368. Springer, (2023)Probabilistic Analysis and Practical Algorithms for the Flow Shop Weighted Completion Time Problem., and . Oper. Res., 46 (6): 872-882 (1998)Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem., , and . Oper. Res., 61 (2): 469-482 (2013)Optimal spot market inventory strategies in the presence of cost and price risk., , , and . Math. Methods Oper. Res., 73 (1): 109-137 (2011)