Author of the publication

A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly.

, , , , , , , , and . Int. J. Computer Integrated Manufacturing, 17 (8): 733-749 (2004)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A hybrid artificial bee colony algorithm for the job-shop scheduling problem with no-wait constraint., , , , and . Soft Comput., 21 (5): 1193-1202 (2017)APS, ERP and MES systems integration for semiconductor backend assembly., , , , , and . ICARCV, page 1403-1408. IEEE, (2002)Differential Evolution Algorithms for the Generalized Assignment problem., , , and . IEEE Congress on Evolutionary Computation, page 2606-2613. IEEE, (2009)A Heuristics-based Advanced Planning and Scheduling System with Bottleneck Scheduling Algorithm., , , and . ETFA, page 240-247. IEEE, (2006)A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly., , , , , , , , and . Int. J. Computer Integrated Manufacturing, 17 (8): 733-749 (2004)Common capacity modelling for multi-site planning: case studies., , , and . ETFA, page 336-343. IEEE, (2007)A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly., , and . ETFA, page 1024-1030. IEEE, (2007)Implementing Real-time Scheduling System for a Precision Engineering Company in Singapore., , , , , , , and . IEEM, page 736-740. IEEE, (2020)An enhanced migrating birds optimization algorithm for no-wait flow shop scheduling problem., , and . CISched, page 9-13. IEEE, (2013)A Hybrid Discrete Differential Evolution Algorithm for Economic Lot Scheduling Problem with Time Variant Lot Sizing., , , , , and . SOCO, volume 188 of Advances in Intelligent Systems and Computing, page 1-12. Springer, (2012)