J. Gustafsson, B. Lisper, C. Sandberg, and N. Bermudo. Object-Oriented Real-Time Dependable Systems, 2003.(WORDS 2003). Proceedings of the Eighth International Workshop on, page 106-112. IEEE Computer Society, (2003)http://dblp.uni-trier.de/db/conf/words/words2003.html#GustafssonLSB03.
T. Mitra, and A. Roychoudhury. (June 2002)Short version of:
A Framework to Model Branch Prediction for WCET Analysis,
Tulika Mitra, Abhik Roychoudhury,
2nd Workshop on Worst Case Execution Time Analysis (WCET), Austria, June 2002. Also available as NUS Technical Report 11-01.
One of Author's homepage:
http://www.comp.nus.edu.sg/~abhik/.
T. Mitra, and A. Roychoudhury. (June 2002)Long version of:
A Framework to Model Branch Prediction for WCET Analysis,
Tulika Mitra, Abhik Roychoudhury,
2nd Workshop on Worst Case Execution Time Analysis (WCET), Austria, June 2002. Also available as NUS Technical Report 11-01.
One of Author's homepage:
http://www.comp.nus.edu.sg/~abhik/.
F. Stappert, A. Ermedahl, and J. Engblom. Proceedings of the 2001 international conference on Compilers, architecture, and synthesis for embedded systems, page 132-140. ACM New York, NY, USA, (2001)http://dblp.uni-trier.de/db/conf/cases/cases2001.html#StappertEE01.
F. Stappert, and P. Altenbernd. Journal of Systems Architecture, 46 (4):
339--356(2000)Friedhelm Stappert, Peter Altenbernd
C-LAB, Fürstenallee 11, D-33095 Paderborn, Germany
Fax: ++49-5251-60-6065
e-mail: fst, peter@c-lab.de.
G. Bernat, and A. Burns. (2000)http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.23.2148
Copyright c 2000 IFAC
Keywords: Real-time, timing-analysis. 1..
P. Puschner. Control Engineering Practice, 6 (1):
129--135(1998)mirror: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.32.7347&rep=rep1&type=pdf.