Author of the publication

Modified chain group sampling inspection plan under item failure scenario based on time truncated scheme.

, and . Int. J. Syst. Assur. Eng. Manag., 15 (3): 1305-1314 (March 2024)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Bootstrap confidence intervals of CpTk for two parameter logistic exponential distribution with applications., , and . Int. J. Syst. Assur. Eng. Manag., 10 (4): 623-631 (2019)Parametric inference of the loss based index C p m for normal distribution., , and . Qual. Reliab. Eng. Int., 38 (1): 405-431 (2022)Modified estimation and confidence intervals of an asymmetric loss-based process capability index C p m ′ $C^_pm$., , and . Qual. Reliab. Eng. Int., 38 (8): 4033-4048 (2022)Improved Attribute Chain Sampling Plan for Darna Distribution., , , and . Comput. Syst. Sci. Eng., 38 (3): 381-392 (2021)Classical and Bayesian inference of Cpy for generalized Lindley distributed quality characteristic., , , and . Quality and Reliability Eng. Int., 35 (8): 2593-2611 (2019)Classical and objective Bayesian estimation and confidence intervals of an asymmetric loss based capability index C p m k ′ $C^_pmk$., , , and . Qual. Reliab. Eng. Int., 38 (4): 1659-1686 (2022)A new approach of time truncated chain sampling inspection plan and its applications., , and . Int. J. Syst. Assur. Eng. Manag., 13 (5): 2307-2326 (2022)Modified chain group sampling inspection plan under item failure scenario based on time truncated scheme., and . Int. J. Syst. Assur. Eng. Manag., 15 (3): 1305-1314 (March 2024)Acceptance sampling inspection plan for the Lindley and power Lindley distributed quality characteristics., , , and . Int. J. Syst. Assur. Eng. Manag., 12 (6): 1410-1419 (2021)Estimation and confidence intervals of a new loss based process capability index $C^_pm$ with applications., and . Int. J. Syst. Assur. Eng. Manag., 14 (5): 1827-1840 (October 2023)