Author of the publication

A Matheuristic with Fixed-Sequence Reoptimization for a Real-Life Inventory Routing Problem.

, , , , and . Transp. Sci., 54 (2): 355-374 (2020)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A project scheduling problem with periodically aggregated resource-constraints., , , , and . Comput. Oper. Res., (2022)On electrical load tracking scheduling for a steel plant., and . Comput. Chem. Eng., 35 (12): 3044-3047 (2011)LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search., , and . Ann. Oper. Res., 131 (1-4): 237-257 (2004)Machine reassignment problem: the ROADEF/EURO challenge 2012., , , and . Ann. Oper. Res., 242 (1): 1-17 (2016)On the strength of time-indexed formulations for the resource-constrained project scheduling problem.. Oper. Res. Lett., 45 (2): 154-159 (2017)Parallel machine scheduling with precedence constraints and setup times., , and . Comput. Oper. Res., 37 (12): 2141-2151 (2010)Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling., , and . Electron. Notes Discret. Math., (2010)Line search method for solving a non-preemptive strictly periodic scheduling problem., and . J. Sched., 19 (3): 227-243 (2016)Solution Repair by Inequality Network Propagation in LocalSolver., , and . PPSN (1), volume 12269 of Lecture Notes in Computer Science, page 332-345. Springer, (2020)A Matheuristic with Fixed-Sequence Reoptimization for a Real-Life Inventory Routing Problem., , , , and . Transp. Sci., 54 (2): 355-374 (2020)