Author of the publication

A Bi-Criteria Flow-Shop Scheduling with Preventive Maintenance.

, and . MIM, page 1387-1392. International Federation of Automatic Control, (2013)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

No persons found for author name Hnaien, Faicel
add a person with the name Hnaien, Faicel
 

Other publications of authors with the same name

Sensor deployment optimization methods to achieve both coverage and connectivity in wireless sensor networks., , , , and . Comput. Oper. Res., (2015)Two-machine job shop problem under availability constraints on one machine: Makespan minimization., , and . Comput. Ind. Eng., (2018)A Supply Planning Model for Multilevel Assembly Systems Under Random Lead Times., and . ETFA, page 1348-1351. IEEE, (2006)Signal processing on graphs: Case of sampling in Paley-Wiener spaces., , , and . Signal Process., (2018)Formulations and solution algorithms for dynamic assembly routing problem., and . Int. J. Prod. Res., 58 (3): 671-688 (2020)A Bi-Criteria Flow-Shop Scheduling with Preventive Maintenance., and . MIM, page 1387-1392. International Federation of Automatic Control, (2013)Predictive maintenance planning for railway systems., , , and . CiSt, page 553-558. IEEE, (2023)Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times., , and . Comput. Oper. Res., 37 (11): 1835-1843 (2010)Genetic algorithm for supply planning in two-level assembly systems with random lead times., , and . Eng. Appl. Artif. Intell., 22 (6): 906-915 (2009)Minimising the makespan in the two-machine job shop problem under availability constraints., , and . Int. J. Prod. Res., 57 (5): 1427-1457 (2019)