Author of the publication

Impact of response variability on Pareto front optimization.

, , and . Stat. Anal. Data Min., 8 (5-6): 314-328 (2015)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Bayesian probability of predictive agreement for comparing the outcome of two separate regressions., , and . Quality and Reliability Eng. Int., 34 (6): 968-978 (2018)Three-Dimensional Quantile Plots and Dynamic Quantile Plots of the Prediction Variance for Response Surface Designs., , and . Quality and Reliability Eng. Int., 28 (7): 713-723 (2012)Firework Plot as a Graphical Exploratory Data Analysis Tool for Evaluating the Impact of Outliers in Data Exploration and Regression., and . Quality and Reliability Eng. Int., 30 (8): 1409-1425 (2014)Comparing the Reliability of Related Populations With the Probability of Agreement., and . Technometrics, 59 (3): 371-380 (2017)Do Solar Proton Events Reduce the Number of Faults in Supercomputers?: A Comparative Analysis of Faults During and without Solar Proton Events., , , and . IRPS, page 1-5. IEEE, (2019)A case study for quantifying system reliability and uncertainty., , and . Reliab. Eng. Syst. Saf., 96 (9): 1076-1084 (2011)Using Multiple Criteria Optimization and Two-Stage Genetic Algorithms to Select a Population Management Strategy with Optimized Reliability., , and . Complex., (2018)Statistical analysis for nuclear forensics experiments., , , and . Stat. Anal. Data Min., 8 (5-6): 364-377 (2015)A Case Study on Selecting a Best Allocation of New Data for Improving the Estimation Precision of System and Subsystem Reliability Using Pareto Fronts., , and . Technometrics, 55 (4): 473-487 (2013)Using age and usage for prediction of reliability of an arbitrary system from a finite population., and . Qual. Reliab. Eng. Int., 27 (2): 179-190 (2011)