Author of the publication

Tabu-search optimization approach for no-wait hybrid flow-shop scheduling with dedicated machines.

, and . KES, volume 176 of Procedia Computer Science, page 706-712. Elsevier, (2020)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Towards a Knapsack Model for optimizing e-Training services delivery: Application to Hybrid Intelligent Tutoring Systems., and . CENTERIS/ProjMAN/HCist, volume 164 of Procedia Computer Science, page 257-264. Elsevier, (2019)Heuristics for the Hybrid Flow Shop Scheduling Problem with Parallel Machines at the First Stage and Two Dedicated Machines at the Second Stage., , and . ISDA, volume 736 of Advances in Intelligent Systems and Computing, page 693-701. Springer, (2017)Mathematical programming formulations for hybrid flow shop scheduling with parallel machines at the first stage and two dedicated machines at the second stage., , and . SMC, page 4389-4393. IEEE, (2016)A case study of a hybrid flow shop with no-wait and limited idle time to minimize material waste., , and . SISY, page 207-212. IEEE, (2017)An Ontology for Modeling Vehicle Routing Problems., , and . SoMeT, volume 337 of Frontiers in Artificial Intelligence and Applications, page 281-292. IOS Press, (2021)A Novel Hybrid GA for the Assignment of Jobs to Machines in a Complex Hybrid Flow Shop Problem., , and . ISDA, volume 736 of Advances in Intelligent Systems and Computing, page 640-649. Springer, (2017)Tabu-search optimization approach for no-wait hybrid flow-shop scheduling with dedicated machines., and . KES, volume 176 of Procedia Computer Science, page 706-712. Elsevier, (2020)Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times., , and . SMC, page 2990-2995. IEEE, (2016)A two-stage hybrid flow shop problem with dedicated machine and release date., , and . KES, volume 126 of Procedia Computer Science, page 214-223. Elsevier, (2018)An Effective Optimization Approach to Minimize Waste in a Complex Industrial System., and . IEEE Access, (2022)