Author of the publication

Genetic algorithms applied in BOPP film scheduling problems: minimizing total absolute deviation and setup times.

, , and . Appl. Soft Comput., 3 (2): 139-148 (2003)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Integration of Genetic Algorithm and Neural Network for Financial Early Warning System: An Example of Taiwanese Banking Industry., , and . ICICIC (1), page 562-565. IEEE Computer Society, (2006)Adaptive multi-objective genetic algorithms for scheduling of drilling operation in printed circuit board industry., , and . Appl. Soft Comput., 7 (3): 800-806 (2007)Genetic algorithms applied in BOPP film scheduling problems: minimizing total absolute deviation and setup times., , and . Appl. Soft Comput., 3 (2): 139-148 (2003)A Case-Based Reasoning Approach for Due-Date Assignment in a Wafer Fabrication Factory., , and . ICCBR, volume 2080 of Lecture Notes in Computer Science, page 648-659. Springer, (2001)Genetic Heuristic-Based Local Search Algorithms for Single Machine Scheduling Problems with Release Time.. GEM, page 133-136. CSREA Press, (2007)A Global Archive Sub-Population Genetic Algorithm with Adaptive Strategy in Multi-objective Parallel-Machine Scheduling Problem., , and . ICNC (1), volume 4221 of Lecture Notes in Computer Science, page 730-739. Springer, (2006)A Weighted Evolving Fuzzy Neural Network for Electricity Demand Forecasting., , and . ACIIDS, page 330-335. IEEE Computer Society, (2009)Genetic Local Search Algorithms for Single Machine Scheduling Problems with Release Time., , and . PROLAMAT, volume 207 of IFIP, page 875-880. Springer, (2006)A Case-Based Seat Allocation System for Airline Revenue Management., , , and . ICIC (1), volume 4113 of Lecture Notes in Computer Science, page 1003-1011. Springer, (2006)Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory., , and . J. Intell. Manuf., 16 (4-5): 549-557 (2005)