Author of the publication

Developing Game Models for Service Composition to Improve Customization in the Equilibrium State Based on Cloud Manufacturing System.

, , , , and . IEEM, page 289-292. IEEE, (2021)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

No persons found for author name Ghezavati, Vahidreza
add a person with the name Ghezavati, Vahidreza
 

Other publications of authors with the same name

A New Location-Allocation Model for Blood Distribution Considering Limited Lifespan Under Fuzzy Conditions: A Real Application., and . Int. J. Strateg. Decis. Sci., 9 (4): 105-127 (2018)Framework Development for Sustainable Manufacturing Cloud Service Composition System (SMCS) Based on Axiomatic Design., , , , and . IEEM, page 906-909. IEEE, (2021)A Benders' decomposition algorithm for optimizing distribution of perishable products considering postharvest biological behavior in agri-food supply chain: a case study of tomato., , and . Central Eur. J. Oper. Res., 25 (1): 29-54 (2017)Integration of efficient multi-objective ant-colony and a heuristic method to solve a novel multi-objective mixed load school bus routing model., and . Appl. Soft Comput., (2018)A stochastic risk-averse sustainable supply chain network design problem with quantity discount considering multiple sources of uncertainty., , and . Comput. Ind. Eng., (2019)Stochastic flexible flow shop scheduling problem with limited buffers and fixed interval preventive maintenance: a hybrid approach of simulation and metaheuristic algorithms., , and . Simul., (2019)Equilibrial service composition model in Cloud manufacturing (ESCM) based on non-cooperative and cooperative game theory for healthcare service equipping., , , , and . PeerJ Comput. Sci., (2021)Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method., , , and . Comput. Ind. Eng., (2022)Robust resource-constrained project scheduling problem of the project's subcontractors in a cooperative environment under uncertainty: Social complex construction case study., , and . Comput. Ind. Eng., (2019)Sustainability risk management in a cooperative environment under uncertainty., , and . Kybernetes, 48 (3): 385-406 (2019)