Author of the publication

Prerequisites for Successful Production Transfers in the Electronics Industry.

, , and . ILS, volume 262 of Lecture Notes in Business Information Processing, page 168-181. Springer, (2016)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

From First Planner to Last Planner - Applying a Capability Model to Measure the Maturity of the Planning Process in ETO., , , , and . APMS (2), volume 460 of IFIP Advances in Information and Communication Technology, page 240-247. Springer, (2015)Sales and operations planning for delivery date setting in engineer-to-order manufacturing: a research synthesis and framework., , , and . Int. J. Prod. Res., 61 (21): 7302-7332 (November 2023)Prerequisites for Successful Production Transfers in the Electronics Industry., , and . ILS, volume 262 of Lecture Notes in Business Information Processing, page 168-181. Springer, (2016)A Structured Outsourcing Procedure., , and . APMS, volume 488 of IFIP Advances in Information and Communication Technology, page 739-747. Springer, (2016)Learning Through Action: On the Use of Logistics4.0 Lab as Learning Developer., , and . ELEC, volume 610 of IFIP Advances in Information and Communication Technology, page 205-212. Springer, (2021)Assessing Fit of Capacity Planning Methods for Delivery Date Setting: An ETO Case Study., , and . APMS (2), volume 567 of IFIP Advances in Information and Communication Technology, page 265-273. Springer, (2019)APS Feasibility in an Engineer to Order Environment., and . APMS (1), volume 566 of IFIP Advances in Information and Communication Technology, page 604-611. Springer, (2019)Designing a Performance Measurement System for Materials Management Under Engineering Change Situations in ETO Environment., , and . APMS (2), volume 460 of IFIP Advances in Information and Communication Technology, page 263-270. Springer, (2015)Remanufacturing as a Sustainable Strategy in Shipbuilding Industry - A Case Study on Norwegian Shipyards., , , , and . APMS (2), volume 460 of IFIP Advances in Information and Communication Technology, page 232-239. Springer, (2015)Status of engineering change management in the engineer-to-order production environment: insights from a multiple case study., , , , and . Int. J. Prod. Res., 58 (15): 4506-4528 (2020)