Author of the publication

Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem.

, , and . IEEE Access, (2020)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Multiple-objective real-time scheduler for semiconductor wafer fab using Colored Timed Object-oriented Petri nets (CTOPN)., , , and . SMC, page 510-515. IEEE, (2003)Credibility-based chance-constrained multimode resource-constrained project scheduling problem under fuzzy uncertainty., , and . Comput. Ind. Eng., (2022)A Zero-Watermarking Scheme for Prose Writings., , , and . CyberC, page 276-282. IEEE, (2017)Bi-objective robust project scheduling with resource constraints and flexible activity execution lists., , , and . Comput. Ind. Eng., (2021)Performance modeling, real-time dispatching and simulation of wafer fabrication systems using timed extended object-oriented Petri nets., , and . Comput. Ind. Eng., 56 (1): 121-137 (2009)Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem., , and . IEEE Access, (2020)An extended object-oriented Petri nets for modeling and analysis automated re-entrant manufacturing systems., , and . SMC (2), page 1654-1659. IEEE, (2004)Estimating Video Streaming QoE in the 5G Architecture Using Machine Learning., , , , , and . Internet-QoE@MOBICOM, page 7-12. ACM, (2019)An Extended Object-oriented Petri Nets Modeling Based Simulation Platform for Real-time Scheduling of Semiconductor Wafer Fabrication System., , , and . SMC, page 3411-3416. IEEE, (2006)Satellite and Machine Learning Monitoring of Optically Inactive Water Quality Variability in a Tropical River., , , , , , , , , and 4 other author(s). Remote. Sens., 14 (21): 5466 (2022)