Author of the publication

Flow Shop Group Scheduling with Limited Buffer Capacity and Different Workforce.

, , and . ICINCO (2), page 486-491. SciTePress, (2011)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

A new efficient encoding/decoding procedure for the design of a supply chain network with genetic algorithms., , , and . Comput. Ind. Eng., 59 (4): 986-999 (2010)The Shewhart-type RZ control chart for monitoring the ratio of autocorrelated variables., , , , , and . Int. J. Prod. Res., 61 (20): 6746-6771 (October 2023)A bootstrap method for the measurement error estimation in Gauge R & R $R&R$ Studies.. Qual. Reliab. Eng. Int., 38 (7): 3404-3421 (2022)A variable sampling interval Shewhart control chart for monitoring the coefficient of variation in short production runs., , , and . Int. J. Prod. Res., 55 (19): 5521-5536 (2017)Statistical Performance of a Control Chart for Individual Observations Monitoring the Ratio of Two Normal Variables., , , and . Quality and Reliability Eng. Int., 30 (8): 1361-1377 (2014)Performance of t control charts in short runs with unknown shift sizes., , , and . Comput. Ind. Eng., 64 (1): 56-68 (2013)Constrained scheduling of jobs with different due dates in a flowshop., , and . SMC (2), page 6. IEEE, (2002)The economic performance of the Shewhart t chart., , , and . Quality and Reliability Eng. Int., 28 (2): 159-180 (2012)An Evolutionary Algorithm for Pure Fuzzy Flowshop Scheduling Problems., , and . International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, 11 (6): 655-670 (2003)Economic design of inspection strategies to monitor dispersion in short production runs., , , and . Comput. Ind. Eng., 59 (4): 887-897 (2010)