Author of the publication

Conditional, Probabilistic Planning: A Unifying Algorithm and Effective Search Control Mechanisms.

, and . AAAI/IAAI, page 577-584. AAAI Press / The MIT Press, (1999)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Engineering a Conformant Probabilistic Planner., , and . J. Artif. Intell. Res., (2006)Expecting the unexpected: representing, reasoning about, and assessing construction project contingencies., , and . WSC, page 2041-2050. WSC, (2007)A First-Order Logic Based Framework for Verifying Simulations., , , and . AAAI, page 1635-1636. AAAI Press, (2013)Construction schedule simulation for improved project planning: Activity criticality index assessment., , and . WSC, page 3237-3248. IEEE, (2013)Using situational simulations to collect and analyze dynamic construction management decision-making data., , and . WSC, page 2377-2386. WSC, (2008)Strategy optimization and generation for construction project management using an interactive simulation., , and . WSC, page 3088-3099. IEEE, (2010)Engineering a Conformant Probabilistic Planner, , and . CoRR, (2011)Construction Management Applications: Challenges in Developing Execution Control Plans., , and . ICAPS, page 263-267. AAAI, (2010)An Experimental Framework to Analyze Alternative Decision-making Strategies using Situational Simulations in Construction Management., , , and . WSC, page 2703-2711. IEEE, (2009)Conditional, Probabilistic Planning: A Unifying Algorithm and Effective Search Control Mechanisms., and . AAAI/IAAI, page 577-584. AAAI Press / The MIT Press, (1999)