From post

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

A Topological Model Based on Railway Capacity to Manage Periodic Train Scheduling., , , , , и . SGAI Conf. (Applications), стр. 107-120. Springer, (2004)Tools for resource-constrained project scheduling and control: forward and backward slack analysis., и . J. Oper. Res. Soc., 52 (7): 779-788 (2001)A multicriteria heuristic method to improve resource allocation in multiproject scheduling., , и . Eur. J. Oper. Res., 127 (2): 408-424 (2000)New Heuristics to Solve the "CSOP" Railway Timetabling Problem., , , , , и . IEA/AIE, том 4031 из Lecture Notes in Computer Science, стр. 400-409. Springer, (2006)A Decision Support System (DSS) for the Railway Scheduling Problem., , , , , и . AIAI, том 154 из IFIP, стр. 465-474. Kluwer/Springer, (2004)A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling., и . Ann. Oper. Res., 102 (1-4): 65-81 (2001)Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling., и . Ann. Oper. Res., 102 (1-4): 263-286 (2001)A Scheduling Order-Based Method to Solve Timetabling Problems., , , , , и . CAEPIA, том 4177 из Lecture Notes in Computer Science, стр. 52-61. Springer, (2005)Optimization in railway scheduling., , , , , и . ICINCO, стр. 188-195. INSTICC Press, (2005)Domain Dependent Distributed Models for Railway Scheduling., , , , , и . SGAI Conf. (Applications), стр. 163-176. Springer, (2006)