Author of the publication

Optimal pricing and ordering digital goods under piracy using game theory.

, , , and . Ann. Oper. Res., 315 (2): 931-968 (2022)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint., , and . Expert Syst. Appl., 39 (5): 5338-5348 (2012)Replenish-up-to multi-chance-constraint inventory control system under fuzzy random lost-sale and backordered quantities., , and . Knowl. Based Syst., (2013)A possibilistic closed-loop supply chain: pricing, advertising and remanufacturing optimization., , and . Neural Comput. Appl., 32 (4): 1195-1215 (2020)Optimising multi-product multi-chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs., , and . Int. J. Systems Science, 41 (10): 1187-1200 (2010)A hybrid method of fuzzy simulation and genetic algorithm to optimize constrained inventory control systems with stochastic replenishments and fuzzy demand., , , and . Inf. Sci., (2013)Single-machine lot scheduling problem for deteriorating items with negative exponential deterioration rate., , and . RAIRO Oper. Res., 53 (4): 1297-1307 (2019)Building a sustainability in a two-echelon closed loop supply chains: a mathematical approach for permissible delay in payment and backlogging., , , and . RAIRO Oper. Res., 56 (6): 4145-4180 (November 2022)Optimal control of an inventory system under whole sale price changes., , and . RAIRO Oper. Res., 55 (Supplement): S289-S305 (2021)An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework., , and . Expert Syst. Appl., 39 (18): 13540-13546 (2012)Assessment of risk-sharing ratio with considering budget constraint and disruption risk under a triangular Pythagorean fuzzy environment in public-private partnership projects., , and . Expert Syst. Appl., (2022)