From post

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed.

 

Другие публикации лиц с тем же именем

Optimization of Material Delivery Problem for Aircraft Moving Assembly Line., , и . CASE, стр. 926-930. IEEE, (2018)A Modified Heuristic Algorithm for Resource Constrained Multi-project Scheduling Problem based on Inspection and Rework., , и . CASE, стр. 1058-1063. IEEE, (2018)A resource investment problem based on project splitting with time windows for aircraft moving assembly line., , , и . Comput. Ind. Eng., (2019)A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line., , и . Optim. Lett., 14 (8): 2161-2195 (2020)Rotating Machinery Fault Diagnosis Under Multiple Working Conditions via a Time-Series Transformer Enhanced by Convolutional Neural Network., , , , и . IEEE Trans. Instrum. Meas., (2023)Remaining Useful Life Estimation of Bearing Using Deep Multiscale Window-Based Transformer., , , и . IEEE Trans. Instrum. Meas., (2023)Efficient β-order Perceptually Motivated Spectral Amplitude Bayesian Estimator Based On Chi-distribution for Speech Enhancement., , , и . J. Comput., 7 (11): 2829-2835 (2012)An equivalent conversion method for dual-armed multi-cluster tool scheduling problems with multi-wafer types., , , , и . Int. J. Manuf. Technol. Manag., 33 (1/2): 14-36 (2019)Integrated optimisation of the flexible resource workload balancing and investment project scheduling problem., и . Int. J. Mechatronics Autom., 6 (2/3): 71-82 (2018)DFA-oriented assembly relation modelling., , , и . Int. J. Computer Integrated Manufacturing, 12 (3): 238-250 (1999)