Аннотация
'l'he right-of-way of an overhead high
voltage power line running through a d1rnlbing
area should be traced taking into
account the various aspect of environmental
protection, among which the electric
field and radio interference. Regulations
in force in Poland and procedures applied
in this field are presented. The effect of
buildings on the distribution of the electric
field around the line and the admissible
field strength values as well as the required
spacing of buildings from the line,
are taken into consideration. The effect
of buildings on the level of radio interference
as well as the method of determining
the spacing of buildings from the
line, admissible from the aspect of the
quality of radio reception are presented.
Пользователи данного ресурса
Пожалуйста,
войдите в систему, чтобы принять участие в дискуссии (добавить собственные рецензию, или комментарий)