Photovoltaic Power Plant Experience at Arizona Public Service: A 5-year Assessment

, , , , and .
Progress in Photovoltaics: Research and Application, (2005)
DOI: 10.1002/pip.593

Abstract

Arizona Public Service (APS) currently has over 4 9MWdc of grid-connected photovoltaic systems that have been installed in its service territory over the past five years. Most of this installed PV capacity is in support of the Arizona Corporation Commission Environmental Portfolio Standard goal that encourages APS to generate 1 1% of its energy generation through renewable resources by 2007, with 60% of that amount from solar. During this time, much has been learned regarding performance, cost, maintenance, installation and design. This paper presents an assessment of these topics and a perspective associated with this PV experience.