Author of the publication

The resource-constrained activity insertion problem with minimum and maximum time lags.

, and . J. Sched., 12 (5): 447-460 (2009)

Please choose a person to relate this publication to

To differ between persons with the same name, the academic degree and the title of an important publication will be displayed. You can also use the button next to the name to display some publications already assigned to the person.

 

Other publications of authors with the same name

On the strength of time-indexed formulations for the resource-constrained project scheduling problem.. Oper. Res. Lett., 45 (2): 154-159 (2017)Solution Repair by Inequality Network Propagation in LocalSolver., , and . PPSN (1), volume 12269 of Lecture Notes in Computer Science, page 332-345. Springer, (2020)On electrical load tracking scheduling for a steel plant., and . Comput. Chem. Eng., 35 (12): 3044-3047 (2011)Machine reassignment problem: the ROADEF/EURO challenge 2012., , , and . Ann. Oper. Res., 242 (1): 1-17 (2016)LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search., , and . Ann. Oper. Res., 131 (1-4): 237-257 (2004)A project scheduling problem with periodically aggregated resource-constraints., , , , and . Comput. Oper. Res., (2022)Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling., , and . Electron. Notes Discret. Math., (2010)Parallel machine scheduling with precedence constraints and setup times., , and . Comput. Oper. Res., 37 (12): 2141-2151 (2010)Line search method for solving a non-preemptive strictly periodic scheduling problem., and . J. Sched., 19 (3): 227-243 (2016)A Matheuristic with Fixed-Sequence Reoptimization for a Real-Life Inventory Routing Problem., , , , and . Transp. Sci., 54 (2): 355-374 (2020)